Charlotte County, FL Logo

941.743.1200
18500 Murdock Circle
Port Charlotte, FL 33948

Mobile Menu close icon
接近搜索

项目状态 Updates

公共工程 Ian Projects

Hurricane Ian Projects

Learn about the ongoing 公共工程 and Facilities repair projects to county roads, right of ways and facilities from damage caused by Hurricane Ian.

Various Intersection Improvements 欧博体育官网 Image

Various Intersection Improvements

Last Updated: 04/29/2024 Category: 巷道 当前阶段: Design Development

The design and construction of new turn lanes and traffic signal modifications at various intersections around Port Charlotte, including Murdock Circle, Cochran Boulevard, Peachland Boulevard, and Veterans Boulevard.

阅读更多

Manasota Key Sidewalk, Lighting & 景观

Manasota Key Sidewalk, Lighting & 景观

Last Updated: 04/29/2024 Category: 人行道上 Category: 景观 Category: 其他 当前阶段: Design Development

Gulf Boulevard Sidewalk, Lighting & 景观

阅读更多

Midway Boulevard Sidewalk (HB41)

Midway Boulevard Sidewalk (HB41)

Last Updated: 04/29/2024 Category: 人行道上 当前阶段: Planning and Project Approval

Midway Boulevard sidewalk and pedestrian bridge.

阅读更多

Landfill Scale House (Zemel 路) 欧博体育官网 Image

Landfill Scale House (Zemel 路)

Last Updated: 04/29/2024 Category: County Facilities 当前阶段: 建设

The scale house at the Zemel 路 Landfill is currently a trailer nearing end of expected usable lifecycle. 另外, not compliant with the County's Ordinance of not utilizing trailers as permanent operations. The project would move the physical location of the scale house and its ancillary functions of a convenience center and household hazardous waste. The project will also streamline the flow and control of traffic in and out of the landfill.

阅读更多

Building D Renovations

Building D Renovations

Last Updated: 04/29/2024 当前阶段: Planning and Project Approval

阅读更多

Sandhill Blvd Widening

Sandhill Blvd Widening

Last Updated: 04/29/2024 Category: 巷道 当前阶段: Planning and Project Approval

Sandhill Blvd Widening

阅读更多

Cleveland Avenue Sidewalk

Cleveland Avenue Sidewalk Sales Tax Project

Last Updated: 04/29/2024 Category: Sales Tax Funded Category: 人行道上 当前阶段: Planning and Project Approval

The BCC has requested a sidewalk be designed and constructed on Cleveland as part of the 2020 Sales Tax Extension.

阅读更多

Airport 路 Sidewalk

Airport 路 Sidewalk Sales Tax Project

Last Updated: 04/29/2024 Category: Sales Tax Funded Category: 人行道上 当前阶段: Planning and Project Approval

Design and construct a sidewalk on Airport Rd. as part of the 2020 sales tax CIP

阅读更多

Gulf Cove 人行道上

Gulf Cove 人行道上

Last Updated: 04/29/2024 Category: 人行道上 当前阶段: Planning and Project Approval

Gulf Cove 人行道上

阅读更多

Delivering Exceptional Service

问题? 问题?

欧博体育